ePrivacy and GPDR Cookie Consent by Cookie Consent
News

News

en / Products
07.05.2021

Two new Flex level crossings near Bremen successfully put into operation

At the end of April, two Flex level crossing systems were successfully put into operation on the Annenheide-Adelheide line in Delmenhorst near Bremen, Germany.
With the new Brendelweg and Adelheiderstrasse installations, this brings the current total to three level crossings from Schweizer Electronic in full operation on this line. Two Flex installations are equipped with light signals, the third installation is equipped with a total of ten light signals and six level crossings.
The Schweizer Electronic systems were inspected, tested and accepted into service by the representative of the German Federal Railway Authority (EBA). Particular attention was paid to the compact drives without counterweights and these were very positively received.
Once again, a successful project was implemented on time thanks to good collaborative teamwork and good knowledge exchange and communication with our partners.

Flex level crossing Schweizer Electronic
Flex level crossing system Schweizer Electronic
Teilen